当前位置:首页 / TBT/SPS通报 /DUS 1587:2017, Development of a safety and environmental management system - Onshore oil and gas production operations - Requirements. (20 pages, in English).

DUS 1587:2017, Development of a safety and environmental management system - Onshore oil and gas production operations - Requirements. (20 pages, in English).


Uganda
TBT
2017-02-16
2017-04-17
<p style="margin:6pt 0cm;"><span style="font-size:x-small;font-face:Verdana;"><span style="font-size:9pt;"><span>his Draft Uganda Standard provides requirements for any entity in the operations of onshore oil and natural gas production, including drilling, construction, well servicing, and maintenance&nbsp;activities. In addition to having an effective SEMS, responsible development includes being a good&nbsp;neighbour and being committed to environmental protection and compliance with all applicable&nbsp;federal, state, and local regulations. Annex B provides requirements for an entity to consider as a good neighbour.<strong></strong></span></span></span></p><p style="margin:6pt 0cm;"><span style="font-size:x-small;font-face:Verdana;"><span style="font-size:9pt;"><span>This Draft Uganda Standard on effective SEMS shall have a fundamental objective of promoting&nbsp;continuous progress towards making safety and environmental protection an integral part of the&nbsp;companys culture. A SEMS shall address facilities, engineering design, equipment, and work&nbsp;processes relevant to the appropriate owners, contractors, or suppliers.</span></span></span></p><p><span style="font-size:x-small;font-face:Verdana;"><span style="font-size:9pt;"><span>This Draft Uganda Standard is designed to aid companies in initiating the development of a SEMS.&nbsp;The intent is to identify a series of tools to assist in the development and implementation, or&nbsp;improvement, of the system. The design of each companys system will be unique and its&nbsp;implementation schedule tailored to leverage the existing system at a pace realistic to the company&nbsp;and its business plan. For those beginning the process of implementing a SEMS, it is&nbsp;recommended that the process be implemented over time on a risk basis, evolving into a complete&nbsp;system that addresses appropriate SEMS elements specific to a companys operations. Both&nbsp;design and schedule should initially address higher risk facilities, equipment, and processes;&nbsp;following that, the system should continue to expand to address risk in phases, addressing the&nbsp;more important elements at first and expanding to the full system over time.</span></span></span></p><span style="font-size:x-small;font-face:Verdana;"><span style="font-family:'Verdana','sans-serif';font-size:9pt;">Simply stated, the SEMS may be implemented in several phases on various levels (i.e. geographically, functional areas, system elements). This phase-in schedule should be documented in the planning of the system.</span></span>
G/TBT/N/UGA/608
原文文档   翻译文档

13.020 - Environmental protection;13.020.01 - Environment and environmental protection in general;75.020 - Extraction and processing of petroleum and natural gas;75.060 - Natural gas
点击查看

271111 - Natural gas, liquefied
2711 - Petroleum gas and other gaseous hydrocarbons

Protection of human health or safety (TBT)
Protection of the environment (TBT)
Protection of animal or plant life or health (TBT)
Onshore oil and gas production operations.
lINKS
相关链接